Close Menu
BigRigBigRig
  • Home
  • News
  • Trucking
    • Truckload
    • LTL
    • Driver Issues
    • Equipment
    • Regulation
    • Fraud
    • Logistics
    • CDL Issues
  • Business
    • Finance
    • Supply Chains
    • Technology
    • Trade Compliance
  • Maritime
    • Container
    • Maritime History
    • Shipping
  • About Us
What's Hot

First look: J.B. Hunt’s Q3 earnings

October 15, 2026

Fleetworthy expands Expedited Inspection to 5 states

October 15, 2026

R&R trucking CEO studies $12.7M in belongings after firm collapse

October 15, 2026
BigRigBigRig
  • Home
  • News
  • Trucking
    • Truckload
    • LTL
    • Driver Issues
    • Equipment
    • Regulation
    • Fraud
    • Logistics
    • CDL Issues
  • Business
    • Finance
    • Supply Chains
    • Technology
    • Trade Compliance
  • Maritime
    • Container
    • Maritime History
    • Shipping
  • About Us
BigRigBigRig
Home»Business»Pilot, Tesla open first Megacharger web site, 12 extra underway
Business

Pilot, Tesla open first Megacharger web site, 12 extra underway

October 14, 2026No Comments2 Mins Read
Share Facebook Twitter WhatsApp Copy Link Email Telegram Pinterest Tumblr
Pilot, Tesla open first Megacharger web site, 12 extra underway
Share
Copy Link Facebook Twitter WhatsApp Telegram Email


Pilot Journey Facilities and Tesla have opened their first Megacharger web site for heavy-duty electrical vans, Pilot mentioned Oct. 8. The location, at a Pilot journey heart in Ellabell, Ga., has six charging stalls.

Twelve extra heavy-duty websites are below building, and three are practically completed: a Flying J in Tulare, Calif., scheduled to open Oct. 9; a Flying J in Fort Stockton, Texas; and a Pilot in North Las Vegas, Nev.

Every web site can have 4 to eight stalls operating Tesla’s V4 cupboard know-how. In response to Tesla, every stall can ship as much as 1.2 megawatts, sufficient for a Tesla Semi to get well 60% of its cost in half-hour.

Pilot, a Berkshire Hathaway subsidiary primarily based in Knoxville, Tenn., operates greater than 900 places in 43 states and 5 Canadian provinces. The Megacharger community is deliberate for choose places alongside I-5, I-10, and different main freight corridors in California, Georgia, Indiana, Nevada, and Texas.

“Pilot is proud to carry heavy-duty charging on to key trucking routes and pair it with the providers and facilities drivers depend on,” mentioned Shannon Sturgil, senior vice chairman of different fuels at Pilot.

Ellabell’s opening got here later than Pilot projected. When the businesses introduced the partnership in January, Pilot mentioned building would start within the first half of 2026 and the primary websites would open in the summertime.

The January announcement additionally named New Mexico among the many preliminary states. The October launch drops it and lists Indiana.

The chargers are arriving as Tesla strikes the Semi into high-volume manufacturing, which began at its Sparks, Nev., manufacturing unit on Sept. 24. Tesla expects greater than 30 charging stations and over 200 megawatt-capable posts by year-end, together with the Pilot websites. The plant is designed for 50,000 vans a yr.

Pilot mentioned the heavy-duty websites construct on its passenger EV charging community and its renewable diesel and biodiesel choices.

“With these preliminary places, we’re making fleet electrification a extra accessible possibility for long-haul transportation,” Sturgil mentioned.

The publish Pilot, Tesla open first Megacharger web site, 12 extra underway appeared first on BigRig.

Share. Copy Link Facebook Twitter Pinterest Email WhatsApp Telegram
Previous ArticleNew chief for DP World Americas
Next Article Parcel transport prices method report excessive as additional prices stack up

Related Posts

Fleetworthy expands Expedited Inspection to 5 states

October 15, 2026

Prologis tops Q3 estimates, raises growth begins forecast once more

October 15, 2026

Westport turns into Aetherion, bets on CNG for US long-haul

October 15, 2026
Demo
Top Posts

Bot Auto commits to U.S.-based distant help operators

August 28, 2026

700 kilos of meth hidden in cucumber load results in 15-year jail sentences

August 27, 2026

Seasonal ag truckers from Mexico face identical English-language guidelines, DOL says

September 1, 2026

Gofo parcel community shortly mushrooms in 2026

August 27, 2026

CBSA finds 385 kilos of cocaine in business truck at US-Canada border

August 26, 2026
Top Trending
Advert
Most Popular

Bot Auto commits to U.S.-based distant help operators

August 28, 2026

700 kilos of meth hidden in cucumber load results in 15-year jail sentences

August 27, 2026

Seasonal ag truckers from Mexico face identical English-language guidelines, DOL says

September 1, 2026
Our Picks

First look: J.B. Hunt’s Q3 earnings

October 15, 2026

Fleetworthy expands Expedited Inspection to 5 states

October 15, 2026

R&R trucking CEO studies $12.7M in belongings after firm collapse

October 15, 2026
About Us
About Us

BigRig covers the stories behind trucking, shipping, transportation and the people who keep commerce moving. We deliver timely, reliable news from trusted industry sources as developments unfold.

  • About Us
  • Contact Us
  • Privacy Policy
  • Terms of Service
2026 © Randall Reilly Talent, LLC. All rights reserved.

Type above and press Enter to search. Press Esc to cancel.